-

Case Study: Matrix House and Matrix 1
November 3rd 2026When businesses move into a new office, they expect the technology to work from day one. Fast, reliable connectivity is no longer a luxury. It is the foundation that supports productivity, collaboration and future growth. That was the challenge facing two prominent office buildings in Llansamlet, Swansea.
Elite Group Wales was appointed to de…
Read more -

Case Study: Fibre Optic Installation, Nuneaton
January 1st 1970Another project we were delighted to be involved with was this fibre optic installation for a large office in Nuneaton
The project involved the installation of 6, 24 Core OM3 cables; a multimode fibre that supports high-speed data transmission and is optimized for laser-based equipment.
We also joined i…
Read more -

Case Study: Fibre Optic Installation, Marylebone, London.
October 6th 2024One of our more recent projects involved the installation of a fibre optic cable network as well as a host of ancillary services for an office in Marylebone, London.
The project involved:
Installation of a 12-core OM4 link between office floors.
The fibre optic cable we installed had 12 individual fibres (cores) that us…
Read more


